21 Moorfields

21 Moorfields

21 Moorfields Key Project Info: Client: Land Securities Value: £275m Dates of engagement: 2014 to 2016 Contractor: Keltbray and Mace Piling rig working from a temporary steel platform over the station roof 2.4m diameter piles are being bored to a depth of 60m to...
Camden Lock Village

Camden Lock Village

Camden Lock Village   The duties undertaken included: Lead for all LUL and NR interface issues on both sites Network Rail Contractor’s Engineering Manager (CEM) and CRE Construction Proposed and agreed monitoring arrangements with NR and LUL Determined list of...
New Cross Gate Depot

New Cross Gate Depot

New Cross Gate Depot Key Project Info: Client: BBC jv Value: £4m Dates of engagement: 2009 to 2010 Contractor: YJL Infrastructure Design and build of the shell and core works for the sheds at New Cross Gate Depot The duties undertaken included: Bid team lead and...