Horse Guards
Key Project Info:
- Client: Ministry of Defence
- Value: £40m
- Dates of engagement: 1992 to 1995
- Contractor: Costain
- Major refurbishment of a major London landmark with competing heritage interest and MoD requirements
The duties undertaken included:
- Lead structural engineer who designed strengthening and alteration works, maximising retention of existing floor timbers while designing for modern floor loads
- Designed remedial measures for other areas of the building with fire damage, rot or where new heavier finishes were to be applied
- Team leadership included draughtsmen and site resident engineer